Limited-Time Summer Incentives

Contemporary Industrial Spaces for Lease
2173 Optic Court | Kelowna, BC
INTRODUCING GATEVIEW AIRPORT PARK
Gateview Airport Park is a brand new industrial complex, totaling 41,000 SF across three buildings. This state-of-the-art complex offers 7 flexible industrial units ranging from 4,594 SF to 19,688 SF.
Gateview Airport Park provides award-winning contemporary design, innovative industrial spaces and exceptional location facing Highway 97 minutes from Kelowna airport.
The construction at Gateview Airport is progressing quickly. Building 1 and 2 are available for immediate occupancy.
Optimize your business potential with Gateview Airport Park’s exclusive offering.
KEY FEATURES

41,000 SF Across
3 Buildings

7 Flexible Units for Lease

Unit Size Range 4,594 SF –19,688 SF

Facing
Highway 97

Building 1 Ready
for Occupancy
BUILDING SPECS

26' Ceiling

Grade Level 12'x14' Loading Door

Ample Surface Parking

Tilt-up Concrete
Construction

3-Phase Power/200V
(All units to be individually metered for gas, water,
and power)

Second Floor Office & Mezzanines
SITE PLAN








STRATEGIC LOCATION. UNLIMITED POTENTIAL.
Gateway Airport Park boasts immediate access to Highway 97 and Kelowna International Airport, offering superior logistics and robust transportation networks. Positioned directly adjacent to Highway 97, the primary thoroughfare of the Okanagan Valley, and seamlessly connected to Highway 33, the Okanagan Connector, and the Trans-Canada Highway, your business enjoys unparalleled connectivity to various destinations.
DRIVE TIMES
- Highway 97 : 1 min
- Kelowna International Airport :
2 mins - Highway 33 : 8 mins
- Downtown Kelowna : 15 mins
- Vernon : 34 mins
Gateway Airport Park boasts immediate access to Highway 97 and Kelowna International Airport, offering superior logistics and robust transportation networks. Positioned directly adjacent to Highway 97, the primary thoroughfare of the Okanagan Valley, and seamlessly connected to Highway 33, the Okanagan Connector, and the Trans-Canada Highway, your business enjoys unparalleled connectivity to various destinations.
DRIVE TIMES
- Highway 97 : 1 min
- Kelowna International Airport : 2 mins
- Highway 33 : 8 mins
- Downtown Kelowna : 15 mins
- Vernon : 34 mins
DRIVE TIMES
- Highway 97 :
1 min - Kelowna
International Airport :
2 mins - Highway 33 :
8 mins - Downtown Kelowna :
15 mins - Vernon :
34 mins
Gateway Airport Park boasts immediate access to Highway 97 and Kelowna International Airport, offering superior logistics and robust transportation networks. Positioned directly adjacent to Highway 97, the primary thoroughfare of the Okanagan Valley, and seamlessly connected to Highway 33, the Okanagan Connector, and the Trans-Canada Highway, your business enjoys unparalleled connectivity to various destinations.
DRIVE TIMES
- Highway 97 : 1 min
- Kelowna International Airport :
2 mins - Highway 33 : 8 mins
- Downtown Kelowna : 15 mins
- Vernon : 34 mins
REGISTER NOW
For Priority Access to Information on Gateview Airport Park
Contact
Stephen Webber
Associate Vice President
Direct: +1 250 861 8104
Mobile: +1 604 970 9134
Stephen.Webber@colliers.com
This website has been prepared by Colliers for advertising and general information only. Colliers makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. This publication is the copyrighted property of Colliers and/or its licensor(s). Copyright © 2024. All rights reserved. This communication is not intended to cause or induce breach of an existing listing agreement. [Include your market’s legal name here. Colliers Macaulay Nicolls Inc.